Tuesday, May 25, 2010

Hydraulic design of pump sumps and intakes

Chapter 1 of ?

The Design of a pumping station involves many aspects of civil and mechanical engineering, the hydraulic design forming only part of the whole process. The hydraulic design deals with the channelling of liquids into the pump, the flow through the pump, and the discharge system.

An unsatisfactory hydraulic design of intakes and sumps could have far reaching implications on the overall performance of the pumping station. The design of pump intakes and sumps is amenable to solution by hydraulic model analysis. However, without proper appreciation of the design criteria, an indifferent first design and layout often results, requiring extensive alterations to the model and considerable difficulty in achieving a satisfactory design.

This document deals only with the flow and control of water from it’s entry into the pumping station up to it’s entry into the pump.

The fluids under consideration are water and air, the water being pumped and the air being above the free surface or, in some cases, being entrained as bubbles within the water. However, the results will apply in principle to other fluids used in the process industries as long as allowance is made for effects arising from the difference in the fluid properties. Viscosity and specific gravity are the most important properties considered.

MORE TO FOLLOW. . . . . . I'm out for now

Thursday, March 18, 2010

Gautrain Construction

Guys, anyone needs to know anything about the Gautrain? Let's talk about it...........

Wednesday, March 17, 2010

Safety Codes

Some clients, when it comes to safety, usually want their own codes to be adhered to. This is mostly done by mining houses and therefore mostly on plants and machinery use. However, there's the small catch on this one.

What if you're working for a mining house and developing a new Greenfield site for them. Do you have to adhere to their codes, or do you have to have your own codes that will be in line with the construction/drilling or whatever it is that you'll be doing on that particular "green"?

You simply cannot duplicate daily requirements on the normal operation of a large industrial plant or power station in a construction project. Requirements will, inevitably, hinder productivity rates and or productivity for that matter. This is simply because the work is completely different. I've read something similar on the Civil Engineering Contractor Bulletin and so it's a little bother.